top of page
Search

Energy Conversion System.

  • Writer: Alan Kenney
    Alan Kenney
  • Jan 24
  • 1 min read

Full Validation January 2026


Associated Power Ltd (APL) has decided to raise funding in two stages, to provide independent validation of its patented Energy Conversion System (ECS).

Stage 1 is to raise £75,000 to refurbish an existing 10m high test rig. Leading hydrodynamic consultants TUV-NEL (see www.tuvnel.com) have already verified calculations for the design of a 30kW ECS unit, but required additional investigation prior to issuing a full validation.

APL will liase with TUV-NEL and equip the test rig with any additional instrumentation or modifications they require to provide a robust validation of the technology.


Stage 2. Following successful validation it is intended to raise £750,000 to £1m funding for the design, construction,location and demonstration of a 5kW operational pilot ECS unit.

The unit will need to be operated for 12 -18 months for demonstration to power industry executives, with the intention of negotiating licensing & royalty agreements


 
 
 

Comments


bottom of page